New 70 Bed Turnkey Care Home Development, Sheringham, Norfolk
Care Build Group have broken ground on their second scheme, a new £11 million, 70-bed care home in Sheringham which is due to open its doors in March 2024.
The 16-month fully turnkey development, funded by Octopus Real Estate, is being built in Sheringham, Norfolk creating a specialist care home split over two storeys.
The home is located on a road fronted position on Weybourne Road on the main approach into Sheringham. The site boasts stunning views over-looking both Sheringham Golf Club and the sea.
The project will see a brand new later living facility created, which will include 70 en-suite bedrooms, office spaces, lounge areas, hairdressing amenities, a commercial kitchen, private dining areas and a pub.
The scheme, designed by Architects Jefferson Sheard, is being built to a certified BREEAM Excellent ‘In Use’ Standard. The Employer’s Agent for the scheme is Edward Cooper Young Chartered Surveyors and the scheme will be built out by Wynbrook Limited.
Full CBG Project Team; Edward Cooper Young Chartered Surveyors / Wynbrook Limited / Jefferson Sheard Architects / Howard Ward Associates Ltd / Martin Design Associates Ltd / Shakespeare Martineau
Ashley Cooper, Director of Care Build Group:
We are delighted to have commenced with our second ‘fully bespoke’ new build Turnkey care home. Working closely with our design team, we have designed another state of the art, fully electric facility meeting our end users’ specific needs and requirements. The commencement of this scheme is a great way for CBG to sign off 2022. We look forward to seeing the scheme progress in 2023 along with the other exciting new build Care Homes we have currently in our pipeline.
Comments